HELION · Pump Pilot risk scenarios

Themenportal · ausschließlich ansehen. Keine Anmeldung, Bearbeitung, Speicherung oder KI-Nutzung.

ISO 9001: 6.1. Event chains, justified gross rating, open evidence and release gates. Fictitious industrial learning example. All figures, roles and documents are simulated; no real release, customer validation or effectiveness confirmation.

Scenario Risk Analysis (SRA) AI Tool

Public example · read-only

Landscape formatDIN A3

PDF & PNG: free for everyone · Other exports: for customers only · JSON: VIPs, Admins and Superadmins only

A3 Management Story · Decision first

Scenario Risk Analysis · SRA AI

HELION · Industrial pump P40
Date:
2026-10-01
Time horizon:
—
Quality check:
0/12 · 0%
Approval status:
12 gate(s) open
1

Decision mandate

Guiding question
Release for customer pilots
Scope
Transport, initial commissioning and cooling; no complete product safety evidence
Time horizon
—
2

Impact tolerance & acceptance

—
Time: —
Quality/Customer: —
Delivery: —
Safety/Compliance: —
Data integrity: —
Risk rule: —
3

Evidence & Assumptions

Strong evidence
0%
A/B share
Open assumptions
0
to be validated
4

Dominant scenario · Root cause → Barrier → Top Event → Barrier → Consequence

SR1: zugesetzter FilterSEVERE · PLAUSIBLEURSACHE / THREATStaubbelastung undversäumte WartungPRÄVENTIVE BARRIEREN—Lücke: —TOP EVENT—MITIGIERENDE BARRIEREN—Lücke: —FOLGE / IMPACTKundenstillstand,Kategorie 4;Trainingsannahme.
5

Risk & System Coupling · inherent → current → target

1234512345Auswirkung →Wahrscheinlichkeit ↑NaNS1NaNNaNS2NaNinhärentaktuell residualZiel nach Maßnahme
KRITISCHE ABHÄNGIGKEITENSZENARIEN / TOP EVENTSWIRKUNGSFELDERS1 · SR1: zugesetzter Filter—S2 · SR2: Ersatzmaterial—Orange = gemeinsame Abhängigkeit / potenzieller Common-Cause-Treiber. Dient der Challenge, nicht als eigenständige Risikobewertung.
6

Management decision

No customer pilot before A1/A2 evidence. Project management decides with QM; target residual risks apply only after test and documented review.
7

Management KPIs

2
Scenarios
1
red inherent
0
red current
0
red target
0
out of tolerance
12-point quality gate: 0/12
Fully define analysis object, decision question, scope, time horizon and impact tolerance. · Document at least two sources/evidence with statement and evidence class. · Explicitly name open assumptions and define a validation path for each assumption.
Scenario Risk Analysis (SRA) AI · A3 Management StoryPage 1 of 4
A3 Story · Scenarios and control logic

Scenario Risk Analysis · SRA AI

HELION · Industrial pump P40
Date:
2026-10-01
Time horizon:
—
Quality check:
0/12 · 0%
Approval status:
12 gate(s) open
S1 · —
SR1: clogged filter
I · 16R · 8open
Tolerance: —
Confidence: —
Evidence: —
Root cause → Top Event
Dust exposure and missed maintenance → —
Conditions / dependencies
—
Event chain
Filter loss → temperature increase → thermal shutdown → system downtime.
Preventive barriers
—
Gap: —
Mitigating barriers
—
Gap: —
Consequence / Impact
Customer downtime, category 4; training assumption.
Justification of occurrence: —
Justification of severity: —
Current residual risk: —
Target risk after actions: —
S2 · —
SR2: substitute material
I · 12R · 4open
Tolerance: —
Confidence: —
Evidence: —
Root cause → Top Event
Supply shortage and unverified substitution → —
Conditions / dependencies
—
Event chain
Material change → seal swells → leakage → recall.
Preventive barriers
—
Gap: —
Mitigating barriers
—
Gap: —
Consequence / Impact
Critical function loss, category 4.
Justification of occurrence: —
Justification of severity: —
Current residual risk: —
Target risk after actions: —
Scenario Risk Analysis (SRA) AI · A3 Management StoryPage 2 of 4
A3 Story · Requirements and implementation

Scenario Risk Analysis · SRA AI

HELION · Industrial pump P40
Date:
2026-10-01
Time horizon:
—
Quality check:
0/12 · 0%
Approval status:
12 gate(s) open
8

Verifiable requirements · Sheet 1

Source scenarioRequirementAcceptance criterionEvidence
SS1: Shutdown before impermissible component temperature; define threshold in thermal validation.
SS2: Substitute materials only after durability and release test.
9

Actions · Effectiveness instead of activity · Sheet 1

ActionScenarioOwner / Due dateEffectiveness evidence
preventive
Test filter blockage and sensor failure at maximum load; document measurement uncertainty and shutdown threshold.
SS1Validation management
2026-10-23
open
preventive
Test three material batches in the operating medium; ERP block if release is missing.
SS2Materials engineering / Purchasing
2026-10-30
open
Scenario Risk Analysis (SRA) AI · A3 Management StoryPage 3 of 4
A3 Story · Early warning, challenge and approval

Scenario Risk Analysis · SRA AI

HELION · Industrial pump P40
Date:
2026-10-01
Time horizon:
—
Quality check:
0/12 · 0%
Approval status:
12 gate(s) open
10

KRI/KCI · Trigger initiates action

TypeScenarioIndicatorObjective / taktTrigger & Owner
Temperature-related shutdowns per 100 operating hours≤ 1; always report safety-critical deviations immediately
weekly in pilot
> 1: stop pilot and check root cause
Service management
Unchecked material substitutions0
per delivery
≥ 1: block batch
Purchasing
11

Challenge · actively check for cognitive biases

Counter-scenario
—
Bias check
—
Dissent / opposing position
—
12

Conclusion · Residual risk & approval

Both event chains addressed comprehensively; pending validation prevents release.
Review:
—
Date:
—
Scenario Risk Analysis (SRA) AI · A3 Management StoryPage 4 of 4
fmea.net · Persönlicher KontaktReaktionszeit < 24h

Contact & Consulting

Ob Fragen zur FMEA, Unterstützung bei der Anwendung oder individuelle Beratung: Unser Team hilft Ihnen gerne weiter. Nutzen Sie das Formular für Ihre Anfrage.